Assistance to the Infrastructure Contracting Authority

TechnicAtome provides support for the Defence Infrastructure Service (SID) in the naval bases of Toulon and Brest, to adapt reception and support facilities for nuclear submarines.

TechnicAtome provides support for SID to develop a master plan and prepare the infrastructure transformation programmes of the naval bases in Toulon and Brest. This assistance mission features a special dimension relating to nuclear safety.

Main Stages for Toulon :
  • 2015 Drawing up the 1rst master plan of the port area comprising the 3 docks for berthing SNA BARRACUDA.
  • 2016-2017 The adjustment programme for the 2nd dock (2017-2023).
  • 2017-2018 The adjustment programme for the 3rd dock (2017-2023).
  • 2019 : Using a PLM to control the configuration.
  • 2019 et after : Supervision of the design and production of adjustments to the 2nd and 3rd docks and 3rd bassins.
  • Late 2020 : start of work on dock 2.